EasyManua.ls Logo

Toshiba HWT-601XWHM3W-ETR - Page 92

Toshiba HWT-601XWHM3W-ETR
230 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
91
7-4.
Outdoor unit
control
Jumper switching O: Short circuit ×: Open
5-2) Advance defrost operation
When compressor temperature is low, defrosting preliminary operation will be carried out to carry defrosting smoothly in
effect.
1) Start condition of advance defrosting
•TD < 50ºC and A, B, C or D zone detected.
2) Conditions for changing over from defrosting preliminary operation to defrosting.
• When TD 50°C is detected during defrosting preliminary operation.
• When thermostat is turned off during defrosting preliminary operation.
• When defrosting preliminary operation is carried out more than 10 minutes.
3) Control details
• Target SH during defrosting preliminary operation will be 6 to 10 K. (refer to 7-4-1 (See page 86))
• PMV control interval will be shorter than normal.
• Operation frequency will be fixed.
*1. When TD 50°C, Advance defrosting will be skipped.
Item Operation flow and applicable data, etc.
J805 J806 [d]
O O 150 min (Factory default)
O × 90 min
× O 60 min
× × 30 min
801, 1101
Advance defrosting (*1) Defrosting operation
Compressor
OFF
40 Hz
Outdoor FAN
OFF
ON
4-way valve
OFF
ON
Outdoor PMV
380 pulse
400 pulse
0 pulse
Dotted line shows an operating image.
40s30s20s10s0s40s30s20s10s0s

Table of Contents

Related product manuals