6. Coil of 2WAY-VALVE (SVS, SVSS, SVDD, SVD)
1 Detachment
1) Perform work of procedure 1. -1) (Electric parts cover) and 5. -1) (top plate).
2) Remove lead wires of coils(SVS,SVSS, SVDD, SVD) from wire clamp.
3) Remove fixing screws with the Coil connection plate and then remove the coil.
4) Remove the wires from the terminal (TB01,TB02) and the P.C.board (CN710).
Fixing screw size
SVS ,SVSS ,SVDD,SVD : M4x0.24" (6mm)(1ea.)
Heat sink(SVSS,SVD)
Wire Clamp