EasyManua.ls Logo

Toshiba RBC-AWSU52-UL - Before Use Preparation; Initial Setup and Power Requirements; Remote Controller Components; Identifying Remote Controller Buttons

Toshiba RBC-AWSU52-UL
63 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
–6–
Owner’s Manual
EN
3 Before use
When you use the air conditioner for the first time or change the settings, follow the procedures below. From the
next time, just press [ ON/OFF] to start operating according to the settings.
Preparation
Turn on the power breaker
When the power is turned on, “ ” appears on the remote controller display.
* The remote controller will not work for about 3 minute after turning on the power. This is not a malfunction.
REQUIREMENT
Keep the power breaker turned on during use.
When you resume using the air conditioner after a long period of disuse, turn on the power breaker at least 12 hours before
starting operation.
4 Part names and functions
* The screens shown here are examples. The content that is displayed may differ, depending on the environment settings
being used.
1 [ Menu] button
Shows the “Menu”.
(Page 17)
2 [ Set/Fix] button
Fixes and applies settings.
Ways to use it are shown on screen.
3 [ Return] button
Deletes selections.
Ways to use it are shown on screen.
4 [ ] and [ ] buttons
Changes settings and selects items.
5 [ ] and [ ] buttons
Selects setting items.
Other ways to use it are shown on screen.
6 [ ON/OFF] button
Starts and stops connected devices.
1
2
3
6
4
5
Temperature sensor
Operating LED
Lights while operating.
Model name label

Table of Contents

Other manuals for Toshiba RBC-AWSU52-UL

Related product manuals