EasyManua.ls Logo

Toshiba Satellite 110 Series - Page 139

Toshiba Satellite 110 Series
192 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
110 Series 4-29
7. Lift the power cord socket straight up until it clears its slots and remove the
AC PS unit.
Figure 4-28 Removing the holder assembly and power cord socket
Installing the AC PS Unit
To install the AC PS unit, follow the steps below and refer to Figures 4-27 and 4-28.
1. Seat the power cord socket with the side with markings facing up. Press gently
to secure its position.
2. Seat the holder assembly and plastic cover, then secure it with two M2.5x6
screws.
3. Seat the AC PS unit. Be sure to fit the AC PS unit’s plastic cover into the notch
on the holder assembly (Figure 4-27).
4. Secure the tape to the plastic plate and the AC PS unit. Make sure the tape is
placed just above the word “CAUTION” (Figure 4-27).
5. Secure the AC PS unit with one M2.5x10 screw.
6. Connect the AC PS unit cable to PJ502 and thread the cable between PJ6 and the
battery terminal. Secure the cable with tape.
7. Install the HDD interface board, top cover with display assembly, RTC battery,
sub-battery, VGA assembly, keyboard, HDD, optional memory module, optional
PC card, and battery pack as described in Sections 4.9 back through 4.2.

Table of Contents

Other manuals for Toshiba Satellite 110 Series

Related product manuals