EasyManua.ls Logo

Toshiba T1200 - 3.4 System Test

Toshiba T1200
213 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.4
SYSUII
TEST
Subtest
01
ROM
checksum
(Execution
time:
1
second)
This
test
performs
the
ROM
checksum
test
on
the
system
PCB.
(Test
extent
:
FOOOOH
- FFFFFH 64KB)
Subtest
02
HOD
off-SW
Rote:
Confirm
that
turn
the
HDD
switch
on.
After
checking
the
operation
of
the
HOD
switch,
comfirm
that
signals
are
being
exchange
between
the
CPU
and
the
PS
(Power
Supply).
Operation
for
the
test
is
as
follows.
1.
After
executing
the
test,
the
following
message
will
appear.
***
HOD
off-switch
test
start ***
2.
Turn
the
HDD
switch
off.
The
following
message
will
appear.
***
HOD
off-switch
test
OK
! ***
3.
Press
Enter,
then
return
to
the
subtest
menu
of
the
system
test.
3-6

Other manuals for Toshiba T1200

Related product manuals