EasyManua.ls Logo

Toshiba T2150 series - Subtest 02 Board (#1) <=> board (#2); Subtest 03 Point to point (Send); Subtest 04 Point to point (Receive); Subtest 05 Interrupt Test

Toshiba T2150 series
195 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-26
T2150 Series
Subtest 03 Point to point (Send)
NOTE: To execute this subtest, two machines must be connected with an
RS-232-C direct cable. One machine should be set as “send” (subtest
03) and the other set as ‘receive’ (subtest 04). The wiring diagram for
the RS-232-C direct cable is described in Appendix G.
This subtest sends 20h through 7Eh data to the receive side, then receives the
sent data and compares it to the original data.
Subtest 04 Point to point (Receive)
This subtest is used with subtest 03 described above. This subtest receives the
data from the send side, then sends the received data.
Subtest 05 Interrupt Test
This subtest checks the Interrupt Request Level of IRQ 4, 3, and 5 from the
send side.

Related product manuals