EasyManua.ls Logo

Toshiba TCB-SC640U-E - LCD Display Part (Air to Water Heat Pump)

Toshiba TCB-SC640U-E
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Central Remote Controller Installation Manual
14
-EN
3-2. How to Install
When installing to control board (control panel) or to a wall
The thickness of the board or wall must be 1.6 mm to 10 mm.
Prepare the holes for installation beforehand, following the the diagram below (Panel cut dimensions diagram).
Remove 1 panel fixing screw and open the panel.
Attach the lower case with the four included fixing screws.
Close the panel and attach it with 1 panel fixing screw.
CAUTION
Do not wire communication lines (control wiring between indoor and outdoor units, central control wiring) or input/output
wiring next to power supply wiring, etc., or house them in the same metal pipe. Doing so may result in failure.
Install the central remote controller away from noise sources.
100
50 50
95
100
50 50
42 42
84
Panel
Control board or a wall
Panel fixing screw
Lower case
Fixing screws
< Panel cut dimensions diagram >
W:95 × H:84
Square hole
Screw holes (4 places)
47.5 47.5

Other manuals for Toshiba TCB-SC640U-E

Related product manuals