EasyManua.ls Logo

TP-Link TL-SL1226P - Power On Procedure; Device Initialization

TP-Link TL-SL1226P
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Unmanaged PoE+ Switch
Connection
3.4 Power On
Plug the negative connector of the provided power cord into the power socket of the device and plug
the positive connector into a power outlet as the following figure shows.
Figure 3-3 Connecting to Power Supply
Note:
The gure is to illustrate the application and principle. The provided plug and the socket in
your region may dier from the gures above.
3.5 Initialization
After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically
to ensure the device functions properly. During this time, its LED indicators will respond as follows:
1. The PWR LED indicator will light up and keep on.
2. After the initialization, the Link/Act LED indicator for 10/100/1000 Mbps ports and SFP ports will
first turn green and then yellow momentarily, and finally turn off again.
3. After the initialization, the LED indicators for PoE status and PoE max will flash momentarily and
then turn off again.
Finally, all LED indicators will work normally.

Related product manuals