EasyManua.ls Logo

Trane BAYUVCLK001 - Left Side UV Lamp Bracket Installation

Trane BAYUVCLK001
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
18-GJ11D1-2
STEP 5. Once a proper dry fit has been verified, use the alcohol
swabs to clean the area where the bracket is to be mounted.
STEP 6. Remove liner from adhesive on back of bracket and care-
fully place bracket in coil compartment.
STEP 7. Apply pressure firmly over all areas of the bracket to
permanently secure the adhesive to the coil compartment
inner wall.
STEP 8. Cut the cable tie on the left side lamp bracket assembly.
Slide the lamp and reflector assembly out of the lamp bracket
as shown.
STEP 9. Measure 7.5 inches above the cross bar and make a
mark on the inside of the air handler cabinet. Follow the same
process as the right side bracket.
Perform a dry fit test before cleaning the air handler cabinet and
securing the bracket in place.
Left Side UV Lamp bracket installation
End View
Cross bar
7.5”
3. Scribe Horizontal Line
Locating Bottom of Lamp
Bracket
-
Scribe Line