EasyManua.ls Logo

Trane SFHJ090-162 - Field Converting Horizontal Ductwork (Supply or Return) from Right to the Left Side

Trane SFHJ090-162
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
RT-SVX24J-EN 47
Field Converting Horizontal Ductwork
(Supply or Return) from Right to the Left
Side
To field convert horizontal ductwork from right side to the
left, follow this procedure:
1. Remove Panel 2 from end of unit
2. Remove the Door and Door header from the left side.
3. Assemble Door header and Door removed from the left
side in the empty location
on the end wall.
4. Remove Panel 1 and Post from the left side. Remove
gaskets from the
base rail flange at the bottom.
5. Remove the top duct adapter, side duct adapters,
header, and footer in
this order from the right side.
Remove gaskets from post side flanges and the base
rail flange at the bottom.
6. Assemble gaskets, header, footer, side duct adapters,
and top duct adapter in
this order to the left side. See
Figure 17, p. 46 for gasket application details.
7. Finally assemble Post, gaskets, Panel 1, and Panel 2 in
this order to the right
side to complete the field
conversion. See figure 14 for gasket application
details.

Table of Contents

Related product manuals