Changing Schedules
100 BMTX-SVU01B-EN
Figure 88. Remove an Exception/Holidays Dialog Box
2. Highlight the exception or holiday you want to remove, then click the
Remove button. (The Selection option is the default selection.)
• To remove all exceptions and holidays, click the All option. (The
Holidays and Exceptions check boxes are automatically checked.)
Click the Remove button to remove all items.
• To remove all exceptions and holidays before a certain date, click
the Before Date option. Select the appropriate date. Then click
the Remove button. All exceptions before that date are removed.
Linking and Unlinking Events to Days
When two or more days in a schedule are linked, those days have the
same events. For example, Monday, Tuesday, Wednesday, Thursday, and
Friday can all have the same events. If you want to add an event to Fri-
day, however, you must unlink Friday from the rest of the days it is linked
to so the additional event will only happen on Friday.
To link or unlink days:
1. Change the schedule for the desired day.
2. Click Save. The Save Normal Schedule window displays (see
Figure 89 on page 101).