EasyManua.ls Logo

Trane TRACER SUMMIT BMTX-SVU01B-EN - Chapter 13 Changing Chiller Plant Status Information

Trane TRACER SUMMIT BMTX-SVU01B-EN
246 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BMTX-SVU01B-EN 207
Chapter 13
Changing Chiller Plant Status
Information
The Chiller Plant Control program is used to coordinate chillers and pro-
vide system chilled water control. The program performs four main func-
tions:
It controls leaving water temperature by adding chillers as the build-
ing cooling load increases. It also calculates the chilled water setpoint
sent for each chiller.
It recovers from failures by starting the next chiller in the sequence
immediately after a chiller is marked failed.
It optimizes energy use by subtracting chillers when the cooling load
does not require them to be enabled. It also matches chillers to the
load.
It equalizes runtime and wear on each chiller by using different rota-
tion schemes. It also provides a more reliable chiller plant by periodi-
cally exercising all of its components.
This chapter describes how to use the Chiller Plant Control Status screen
to perform these functions. This screen allows quick access to valuable
chiller plant information (such as when the next chiller add or subtract
will occur) and allows you to perform the following tasks:
Reset a chiller failure
Force a chiller to be added
Force a chiller to be subtracted
Make a chiller unavailable
Make a chiller available
Force the chiller sequence to be rotated

Table of Contents

Related product manuals