Do you have a question about the Tritium PKM150 and is the answer not in the manual?
Critical steps for safe, compliant high-power electrical connections.
Guidelines for storing and handling the PKM150 RU unit.
Specifications for crate and rectifier weights and dimensions.
Overview of the PKM150 system and necessary site survey and configuration.
Procedures for securing the unit to the foundation and requirements for the foundation.
Required clearance around the PKM150 RU for maintenance.
Dimensions and layout of the foundation plate and overall footprint.
Cabinet orientation, access points, and cable cut length specifications.
Steps for site preparation, foundation precast, and contents of the rectifier unit.
Installation of the cable entry frame and DC output gland plate.
Procedures for making AC input connections to the unit.
Steps for physically installing the main rectifier unit cabinet.
Detailed steps for terminating various cables, including AC, DC, and earth.
Wiring requirements for emergency power-off functionality.
Procedures for network connectivity and installing the SIM card for modem.
History of changes and updates made to the document.
| Product Type | Battery Charger |
|---|---|
| Maximum Current | 150 A |
| Efficiency | >95% |
| Cooling | Liquid Cooled |
| Output Current | 150A DC |
| Operating Temperature | 50°C |
| Protection Features | Over Voltage, Over Current, Over Temperature, Short Circuit |