Operation
7 Operation
7.1 Before commissioning
CHECK THE FOLLOWING POINTS BEFORE COMMISSIONING:
•
Completeness and technically flawless condition of the machine and safety devices.
•
Order and cleanliness at the workplace.
•
Cleanliness of optical components (free of dust and dirt).
•
Activated exhaust system.
•
Complete electrical installation.
•
Correct input voltage of the electrical installation.
•
Environmental conditions according to technical specification.
•
Compliance with all laser safety regulations and measures.
•
Fulfill and compliance with all laser safety requirements according to chapter 2.
If errors or functional deviations should occur during the inspection of the listed points, the machine is not considered
to be safe to operate and must not (no longer) be put into operation until the fault is corrected.
If you have any questions, contact our experienced Technical Support in your local area.
1. Level the y-axis (le and right side) using a spirit level.
2. Adjust the machine to the correct height with the
height-adjustable feet on the machine.
47