From
Rday
Fran*
R*y
Frame Relay In-Service Monitoring
at the NNI Application
1
Part
2
-
Monitoring Results at the
NNI
Cmppm
the
FIREBBRD
60W
forfmme
relay
testing according to the
PIRh'BERD
60Wpmnte
Re&
In-Srrvloc
Sew
card.
ERROR
FRMCNT
Result should increment.
If
not, frama are not being transmitted between frame
relay
networks.
LMI
ENQS
Result shouldincrement.
Ifnot,LMIstma~quiresarenot
being
sent between frame
relay switches.
LMl
STAT
Result should increment.
If
not,
LMI
responses
are
not being sent between
frame relay switches.
LMI
ERRS
Result should
equal
zero.
If
not, handshaking between the two
frame
relay switches
is not occurring properly.
LMI
TMOS
Result should equal
zero.
If
not, possibly the
transmit
linkorthe receivelink
between
the two switches is down, or one of the swikhes
is
incorrectly configured.
STATUS
POLL
settings may
also
be incomct.
WC
STAT
Should
read
"ACFIYB".
This indicates that a
WC
exists
between frame relay
networks and
chat
frames can be
transmitted
between he relay switches.
If
not,
then look below for an explanation of other
results:
.
"
"
-
DLCI
is undefined
MACTlVE
-
DLCI
is inactive
NEW
-Dm
was
just
added
DELETED
-Dm
was
just
deleted
PERPORMANCE
AVG%LTIl
This
result should be greater than
zero.
It is ihe average percentage of linkutilization
on the received channel since the start of the test calculated
as
the number of
FRM
OCTS
divided
by
the
total
number of octets received
AVG
TF'UI
This result should correspond to the
rate
being transmitted by the far-end. It
is
the
average received throughput since the start ofthe test, dculated
as
the
td
UDF
bits
divided by the total seconds.
This
result can be used to estimate the Committed
Information
Rate
(CIR).
Tclsommun(esl(onr
Technoquo
Capastlun
-
2OW
Ohuon
Dmr
lknnmwun.
Mdmd
?Uh7b
l?
IWJ,
bW2049.
INI,
$53
,SUM)).
FU
,3011
W023-.
'
'-'
WWU
A&<
hnp,
ww
w
corn
TTC
Technical
Support
1-800-638-2049
I--Fr.Relay.In.MON/Cardl.1/3.97
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com