ZED-F9P-Integration Manual
UBX-18010802 - R02

2 Integration
manual structure
Page 10 of 114
Advance Information
2 Integration manual structure
This document provides a wealth of information to enable a successful ZED-F9P module
implementation. The manual is structured into three main parts covering system, software and
hardware aspects.
The first section, "Getting started" outlines the basics of enabling RTK operation with the ZED-
F9P. This is essential reading for anyone new to the device to enable them to get a working RTK
application up and running.
The following section "Receiver description" provides an exhaustive description of the receivers
functionality. Beginning with the new configuration concept both existing and new users should
read this section to understand the new methods employed. Most of the following sub-sections
should be familiar to existing users of u-blox positioning products, however some changes are
introduced owing to the new configuration concept.
The sections from the "Hardware description" onwards addresses the HW engineers options when
designing the ZED-F9P into a new product. The "Hardware description" section addresses power
supply considerations and peripheral interfacing. The "Design" section goes into further details and
provides guidance for circuit design and PCB lay-out assistance. An important part of a RTK system
is the antenna, this is detailed in the "Antenna" section following the "RF front-end circuit options"
section. Finally we have a "Design in checklist" section that can be used to check that the important
parts of the design in process have been carried out.