EasyManua.ls Logo

Uberhaus 72255106 - Page 26

Uberhaus 72255106
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 26
Step 20 (optional)
Only perform this step in preparation for winter, if you decide not to
disassemble the shelter.
B3
B2
F
G
20.Install the Supporting Posts for winter (B2 and B3) under the horizontal supporting beams, that is,
the second and third beam from the front of the shelter. Proceed to this step before the winter season
to enhance the roof loading ability when there is an accumulation of snow.
NOTE:
In the above illustration, some roof panels are removed in order to clearly show where the
Supporting Posts (B2 & B3) should be placed. Do not remove roof panels for this step.