EasyManua.ls Logo

United States Stove LOGWOOD 2421 User Manual

United States Stove LOGWOOD 2421
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
CAUTION!
Read All Instructions Care-
fully Before Starting The In-
stallation or Operating This
Heater.
DO NOT USE THIS HEATER
IN A MOBILE HOME OR TRAILER
SAVE THIS MANUAL FOR FUTURE REFERENCE
THIS MANUAL WILL HELP YOU TO OBTAIN EFFICIENT, DEPENDABLE SERVICE FROM THE HEATER, AND ENABLE
YOU TO ORDER REPAIR PARTS CORRECTLY. KEEP IN A SAFE PLACE FOR FUTURE REFERENCE.
UNITED STATES STOVE COMPANY
227 Industrial Park Road
P.O. Box 151
South Pittsburg, TN 37380
(423) 837-2100
C
O
M
P
A
N
Y
U
N
I
T
E
D
S
T
A
T
E
S
S
T
O
V
E
C
S
S
U
851094D
Owners ManualOwners Manual
Owners ManualOwners Manual
Owners Manual
Logwood 2421
EPA EXEMPT PER
METHOD 28A
TESTED TO
UL 1482
Question and Answer IconNeed help?

Do you have a question about the United States Stove LOGWOOD 2421 and is the answer not in the manual?

United States Stove LOGWOOD 2421 Specifications

General IconGeneral
TypeWood Stove
Heating CapacityUp to 1, 200 sq. ft.
Fuel TypeWood
MaterialSteel
Efficiency75%
EPA CertifiedYes
Burn TimeUp to 8 hours
Log Size18 inches
Flue Size6 inches
Log Length18 inches

Summary

Tools and Materials Needed

Tools for Installation and Operation

List of tools required for installing and operating the heater.

Materials for Installation

List of materials needed for proper installation of the heater.

Heater Dimensions Diagram

Diagram illustrating the physical dimensions of the heater unit.

Safety Rules

Installation and Operation Safety

Covers proper installation, venting, mobile home use, and user familiarity.

Chimney and Maintenance Safety

Addresses chimney construction, inspection, gas vent prohibition, and creosote.

Fire and Hazard Precautions

Includes ash disposal, paint curing, child safety, and combustible material clearance.

NFPA Safety Guidelines Reference

Recommends obtaining NFPA publication for safe operation.

Installation Instructions

Clearances and Floor Protection

Details required clearances to combustibles and floor protector placement.

Heater Assembly and Setup

Instructions for unpacking, identifying parts, and assembling the heater.

Stove Pipe and Chimney Connection

Guidelines for connecting stove pipe, elbows, thimble, and chimney.

Operation of the Heater

Initial Fire Setup

Preparing the stove and using seasoned wood for initial fires.

Safe Fire Management

Controlling fire rate, providing air, and general operation safety.

Hearth and Door Usage

Instructions for using the hearth and keeping the fuel door closed.

Chimney Connection

Masonry Chimney Guidelines

Requirements for connecting to masonry chimneys, including inspection and flue usage.

UL Listed Chimney Guidelines

Specifications for using UL listed HT chimney connectors and height.

Connector Pipe Installation Rules

Rules for installing stove pipe, including slope, joints, and bends.

Chimney Connector Through Combustible Wall

Figure 8: Wall Pass-Through Systems

Illustrates methods for connecting chimney connector through combustible walls.

Wall Pass-Through System Details

Part A: Masonry Wall Pass-Through

Details on using brick masonry walls and fireclay liners.

Part B: Factory-Built Chimney Length

Specifications for solid insulated factory-built chimney lengths.

Part C: Ventilated Thimble

Requirements for 10" diameter ventilated thimbles.

Part D: 8" Insulated Chimney Section

Specifications for 8" inside diameter solid insulated chimney sections.

Part E: Listed Pass-Through Systems

Using purchased listed factory-built wall pass-through systems.

Chimney Connector to Masonry Chimney (No Wall Pass-Through)

Part B, C, D: Direct Connection

Connecting chimney connector directly to masonry chimney thimble.

Service Hints and Chimney Maintenance

Service Hints for Draft Issues

Troubleshooting common draft problems and pipe obstructions.

Chimney Maintenance: Creosote

Formation of creosote, its dangers, and inspection frequency.

Chimney Fire Procedures

Actions to take during a chimney fire and post-fire inspection.

Model 2421 Repair Parts

Exploded View of Heater Components

Diagram showing all heater parts with corresponding keys.

Parts List with Part Numbers

Detailed list of parts, their numbers, descriptions, and quantities.

How to Order Repair Parts

Information Required for Ordering

Details needed when ordering parts: part number, description, model, and serial number.

Contact Information for Parts

Company contact details for ordering repair parts.

Related product manuals