EasyManua.ls Logo

Universal 79130 - Page 30

Universal 79130
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
Please contact Universal
®
Gym Equipment/FFA Corp. for missing or defective parts at one of the following: Phone 1-800-
472-9856 or Fax 1-662-495-5038 or E-mail at customerservice@universalgymequipment.com.
Mailing address: Universal
®
Gym Equipment/FFA Corp. - 100 Tubb Ave. West Point, MS 39773.
Website www.universalgymequipment.com
FIGURE 13
Step 102.
Step 103.
Step 104.
Step 105.
Step 106.
Step 107.
Step 108.
Step 109.
Step 110.
A1
Insert end of AB CABLE (56) through SLOT of LEG EXTENSION (18). Place AB CABLE in groove of PULLEY
(66) and attach to LEG EXTENSION with 3/8” x 2-1/2” HEX HEAD BOLT (90), 3/8” WASHERS (100) and 3/8”
NYLON NUT (105).
Push AB CABLE (56) through BASE FRAME (1) and pull out at long slot.
A2
Place AB CABLE (56) in groove of PULLEY (66), and attach at end of BASE FRAME (1) with 3/8” x 3” HEX HEAD
BOLT (88), 3/8” WASHERS (100), 3/8” BUSHINGS (76) and 3/8” NYLON NUT (104).
A3
Place AB CABLE (56) in groove of PULLEY (66), and attach at rear hole of long slot in BASE FRAME (1) with 3/8”
x 3” HEX HEAD BOLT (88), 3/8” WASHERS (100), 3/8” BUSHINGS (76) and 3/8” NYLON NUT (104).
A4
Place AB CABLE (56) in groove of PULLEY (66), and attach to FLOATING PULLEY BLOCK WITH HOOK (25)
with 3/8” x 1-3/4” HEX HEAD BOLT (91) and 3/8” NYLON NUT (104).
A5
Place AB CABLE (56) in groove of PULLEY (66), and attach at center hole of long slot in BASE FRAME (1) with
3/8” x 3” HEX HEAD BOLT (88), 3/8” WASHERS (100), 3/8” BUSHINGS (76) and 3/8” NYLON NUT (104).
A6
Place AB CABLE (56) in groove of PULLEY (66), and attach to DOUBLE PULLEY BRACKET (30) with 3/8” x 1-
3/4” HEX HEAD BOLT (91) and 3/8” NYLON NUT (104).
A7
Place AB CABLE (56) in groove of PULLEY (66), and attach at front hole of long slot in BASE FRAME (1) with
3/8” x 3” HEX HEAD BOLT (88), 3/8” WASHERS (100), 3/8” BUSHINGS (76) and 3/8” NYLON NUT (104).
A8
Insert end of AB CABLE (56) through SLOT of PEC DEC UPRIGHT (5). Place AB CABLE in groove of PULLEY
(66) and attach to PEC DEC UPRIGHT with 3/8” x 3” HEX HEAD BOLT (88), 3/8” WASHERS (100), 3/8” BUSH-
INGS (76) and 3/8” NYLON NUT (105).

Related product manuals