EasyManua.ls Logo

USF Wallace & Tiernan DEPOLOX 4 User Manual

Default Icon
113 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DEPOLOX 4
®
BA - 40 004 E
MICROPROCESSOR BASED
ANALYSING AND CONTROL
SYSTEM FOR CHLORINE,
pH AND REDOX IN POTABLE
WATER AND SWIMMING POOLS
Wallace & Tiernan GmbH
D-89305 Günzburg
Telefon (08221) 904-0
Telefax (08221) 904-203
e-mail: wtger@chemfeed.org
www.wallace-tiernan.de

Table of Contents

Questions and Answers:

USF Wallace & Tiernan DEPOLOX 4 Specifications

General IconGeneral
ModelDEPOLOX 4
ManufacturerUSF Wallace & Tiernan
CategoryMeasuring Instruments
Measurement TypeChlorine Dioxide
Output4-20 mA
Power Supply24 VDC
Operating Temperature0-50°C
Weight1.5 kg
DisplayLCD
Dimensions144 x 144 x 144 mm

Summary

DEPOLOX 4 INSTALLATION AND OPERATION THEORY

INSTALLATION OF CHLORINE RESIDUAL ANALYSER

Step-by-step installation of the complete chlorine residual analyser.

THEORY OF OPERATION

Explains the 3-electrode system, potentiostatic control, and current measurement.

INSTALLATION GUIDELINES

LOCATION OF INSTALLATION

Recommendations for choosing the installation location.

SAMPLE WATER TAKE-OFF PROCEDURE

Proper methods for taking sample water, including hose and pipe selection.

STARTUP PROCEDURES

DEPOLOX 4 ANALYZER (PRESSURELESS TYPE) STARTUP

Step-by-step startup for the pressureless type analyzer.

DEPOLOX 4 ANALYZER (PRESSURE TYPE) STARTUP

Step-by-step startup for the pressure type analyzer.

AMPLIFIER FOR CHLORINE MEASURING CELL STARTUP

Initial startup procedure for the amplifier module.

CALIBRATION OF DEPOLOX 4 AMPLIFIER

CALIBRATION OF MEASUREMENT RANGE

How to program and set the measurement range for the amplifier.

CALIBRATION OF BIAS VOLTAGE

Procedure for calibrating the bias voltage of the amplifier.

ZERO CALIBRATION PROCEDURE

Steps to perform zero point calibration for the amplifier.

MEASURED VALUE CALIBRATION PROCEDURE

How to calibrate the amplifier using measured values from a DPD method.

SYSTEM MAINTENANCE

ZERO POINT AND MEASURED VALUE CHECK

Periodic checks of the zero point and measured values.

TROUBLESHOOTING GUIDE

pH-VALUE ANALYSER SYSTEM

pH-PROBE WITH SPECIAL CABLE DETAILS

Details of the pH probe, its membrane, electrolyte, and connector.

pH-VALUE ANALYSER START-UP PROCEDURE

Step-by-step procedure for starting up the pH-value analyser.

pH PROBE MAINTENANCE

Cleaning and maintenance procedures for the pH probe.

REDOX ANALYSER SYSTEM

REDOX PROBE WITH SPECIAL CABLE DETAILS

Details of the Redox probe, its membrane, electrolyte, and connector.

REDOX ANALYSER START-UP PROCEDURE

Procedure for starting up the Redox analyser.

REDOX PROBE MAINTENANCE

Cleaning and maintenance procedures for the Redox probe.

AMPLIFIER SYSTEM OVERVIEW

AMPLIFIER INSTALLATION

How to mount the basic unit and plug-in amplifiers.

ELECTRICAL INSTALLATION PROCEDURES

Details on connecting the mains power supply and wiring the amplifier modules.

PARAMETER AND FUNCTION MENUS OPERATION

How to navigate and change settings in parameter and function menus.

CHLORINE MEASUREMENT AMPLIFIER

pH MEASUREMENT AMPLIFIER

REDOX MEASUREMENT AMPLIFIER

ERROR MESSAGES AND CAUSES

INTEGRAL CONTROLLER OPTION

CHLORINE AMPLIFIER ADAPTATION