EasyManua.ls Logo

Vaisala Radiosonde RS92-SGP - Chapter 3 Operation; General

Vaisala Radiosonde RS92-SGP
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 ________________________________________________________________ Operation
VAISALA_______________________________________________________________________ 15
CHAPTER 3
OPERATION
This chapter contains information that is needed to operate this product.
General
It is essential that you carry out the pre-launch steps as instructed and
always in the same way. Follow the instructions in the sections below
and refer to Appendix A on page 51 for proper and safe balloon
preparation.
The workorder for a sounding is as follows:
1. Prepare the balloon and optional sounding accessories.
2. Unpack the radiosonde.
3. Prepare the sounding.
4. Connect the battery.
5. Launch the radiosonde.
6. Monitor the sounding with the sounding system.
When conducting additional sensor soundings (ozone or radioactivity
soundings), follow the procedures and guidelines in the relevant User’s
Guides.
All manuals and user guides at all-guides.com

Table of Contents