EasyManua.ls Logo

Vaisala RS41-SG - Optional Sounding Accessories

Vaisala RS41-SG
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. When the balloon is suciently filled, in other words, the balloon just raises the gas
nozzle, close the gas valve.
7. Before removing the balloon from the gas nozzle, tie the neck of the balloon tightly
above the balance nozzle with approximately 0.5 m (2 ft) bit of string.
RS41-SG and RS41-SGP User Guide M211667EN-G
18

Related product manuals