EasyManua.ls Logo

Vaisala RVP900 - Optional TDWR Custom Back Panel

Vaisala RVP900
484 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Background
RVP900 supports several test features that are configured in this section.
Vaisala recommends that the LEDs be set to 1:Go/Proc so that the front panel red LED
flashes during each processing cycle.
For operational systems, turn
o the simulation feature.
Test Equipment
KVM connected
Test Procedure
1. Enter the TTY setups through dspx.
2. Issue the M+.
3. Set all the values, as required.
Checklist
Table 98 Debug Options Checklist
Task Checked OK/Not OK Remarks
Test procedure completed successfully.
Parameters are set.
See 5.2.8 M+ Debug Options (page 127).
Parameters have been set.
Test Passed
For Customer Date:
For Vaisala Date:
A.14 Checking Transmitter Phase Control
with Setup Mz Command
Test Goal
Verify that the TTY setups for the Transmitter Phase Control section are properly configured
for the customer application.
This feature is not used for magnetron systems since these have inherent random phase
that is measured, but not controlled.
RVP900 User Guide M211322EN-J
352

Table of Contents

Other manuals for Vaisala RVP900