VRC Series IOM 11 IOM-M2-0316
Technical Support: (800) 789-8550 Part Number 478603
Charging Guidelines
Each circuit should be charged with the
compressor(s) at 100% and as much DX/condenser
load (highest ambient) as possible. Hot gas reheat
should be at 0% during initial charging. Let the
system run for at least 10 minutes between each
adjustment before rechecking. Refer to the following
table for adjustments.
High superheat and low subcooling = Undercharged
Add refrigerant to the system in small increments (0.5-1 lb.)
Low superheat and high subcooling = Overcharged
Remove refrigerant from the system in small increments (0.5-1 lb.)
Normal superheat and low subcooling = Undercharged
Add refrigerant to the system in small increments (0.5-1 lb.)
Normal superheat and high subcooling = Overcharged
Remove refrigerant from the system in small increments (0.5-1 lb.)
High superheat and normal subcooling = Over restricted
Loosen TXV adjustment screw by 1 or 2 turns
Low superheat and normal subcooling = Under restricted
Tighten TXV adjustment screw by 1 or 2 turns
High superheat and high subcooling = Over restricted
Loosen TXV adjustment screw by 1 or 2 turns
Low superheat and low subcooling = Under restricted
Tighten TXV adjustment screw by 1 or 2 turns
Recommended Line Sizes
All line lengths are equivalent line lengths and must
account for fitting pressure drop.
Nominal
Capacity
(BTU/hr)
Discharge Line Size (inches)
Liquid Line
Size (inches)
* Line size in this column = stub connection size on the VPR and VRC units.