EasyManua.ls Logo

Valmet 309 - Controlling the Operation of Stop Solenoid

Valmet 309
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
@NIRON-L ING THE OPERATION OF STOP SOLEM)ID
l.
Clean ihe lever assembly befween
+he
slop
solenold
and +he InJec+lon
pump.
Lubrica+e
the
joints
*llh
englne
ol I and ensure
+ha+
+he
leverage
funqtlons srnooih ly.
2. Renove the rubber
cover
(A)
at +he rea- end of
the
stop solenoid. Check that
+he
disiance
betxeen
-the
lixed sprlng con't acis and itle
fllovlng
contac+ undea the covei is
min.
1,0
rm
rhen
the s-top solenoid
plunger
(B)
is fully
draHn ln
(englne
stop
posi+ion).
No+el Fo i-he opera+ion of ihe s+op
solenoid
i+ is of advanl-age if
the
lever
assenbly
has been adjusted
yl+h
the
plunger
(8)
sllghfly inrards frqn l-he
ouier lock
posiiion.
l{lih +his
adjus'||IEn+,
lprevec, if should be
checked
+hat +he
foik
sc.er
is
sufflclenllv
Inside
the
plunger
and
that the
Injeciion
pumö
funciions
proper
I
y.
11-
l

Related product manuals