EasyManuals Logo

Van's Aircraft RV-12 Maintenance Manual

Van's Aircraft RV-12
217 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #148 background imageLoading...
Page #148 background image
Rev.5
12-16
SERVICE SCHEDULE PROCEDURES
COWL HINGE PIN LUBRICATION
Tools
#2 Phillips screwdriver
Expendable
Dry lubricant
Replaceable
None
Service Rating
Preventative
Minimum Certification
Owner and SPC, LSA-RM or A&P
Additional References
KAI
1. With the cowl hinge pins removed wipe each hinge pin clean.
2. Immediately prior to re-installation apply lubricant along the length of each hinge
pin.
OIL HOSE REPLACEMENT
Tools
1/4, 3/8, 7/8 combo end wrenches, Phillips
screwdriver , wire cutters
Expendable
Plastic tie-wrap 8in
Replaceable
Oil Supply Hose, Oil Cooler Hose, Oil Return Hose,
Oil Tank Vent Tube, Oil Vent Interconnect
Service Rating
Preventative
Minimum Certification
Owner and SPC, LSA-RM or A&P
Additional References
KAI
REMOVAL
1. Remove Cowl (12-4).
2. Drain oil system per Rotax Line Maint. Manual including draining of the oil
cooler.
3. Cut tie-wraps and detach cushioned clamps from oil hoses.
4. Disconnect and remove oil hoses from the oil tank cover assembly, engine and
oil cooler.
5. Remove Oil Tank Vent Tube and Oil Vent Interconnect.
INSTALLATION
1. Installation of new hoses and tubes is reverse of removal procedure.
2. Perform oil purge procedure detailed in Rotax Service Instruction SI-912-018.
WARNING:
B
EFORE PERFORMING ANY INSPECTION OR SERVICE
ALLOW THE ENGINE COMPONENTS TO COOL
.

Table of Contents

Other manuals for Van's Aircraft RV-12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Van's Aircraft RV-12 and is the answer not in the manual?

Van's Aircraft RV-12 Specifications

General IconGeneral
BrandVan's Aircraft
ModelRV-12
CategoryAircrafts
LanguageEnglish

Related product manuals