EasyManua.ls Logo

Vaughn MP55F - Wiring and Final Completion Checklist

Default Icon
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Open highest hot water faucet.
Open cold water inlet valve and fill system.
G. WIRING
TANK MUST BE FULL OF WATER BEFORE POWER IS
ON.
Separate fused branch circuit (refer to local codes).
Mark the electrical shut off for future reference.
Wiring diagram (See WIRING DIAGRAM 1)
Aluminum conductors.
Check to see that voltage on rating plate and supply agree.
CAUTION: Unit must be properly grounded.
H. INSTALLATION COMPLETED AND CHECKLIST
FILLED OUT
BY: ________________________________________________
DATE: ______________________________________________
SPECIAL NOTE: Test of hot water after installation is
necessary to be sure temperature controls are working
properly. (See WATER TEMPERATURE REGULATION)

Related product manuals