14
4 Mounting
POINTRAC 31 • 8/16 mA/HART - four-wire
43388-EN-180322
4 Mounting
4.1 General instructions
The source container is part of the measuring system. In case the
source container is already equipped with an active isotope, the
source container must be locked before mounting.
Danger:
Before mounting; make sure that the source is securely closed. Use
a padlock to secure the source container in the closed condition and
prevent it from being inadvertently opened.
Protect your instrument against moisture ingress through the following
measures:
•
Use a suitable connection cable (see chapter "Connecting to
power supply")
•
Tighten the cable gland or plug connector
•
When mounting horizontally, turn the housing so that the cable
gland or plug connector point downward
•
Lead the connection cable downward in front of the cable entry or
plug connector
This applies mainly to outdoor installations, in areas where high
humidity is expected (e.g. through cleaning processes) and on cooled
or heated vessels.
To maintain the housing protection, make sure that the housing lid is
closed during operation and locked, if necessary.
Makesurethatthedegreeofcontaminationspeciedinchapter
"Technical data" meets the existing ambient conditions.
Make sure before mounting that all parts of the instrument exposed to
the process are suitable for the existing process conditions.
These are mainly:
•
Active measuring component
•
Processtting
•
Process seal
Process conditions in particular are:
•
Process pressure
•
Process temperature
•
Chemical properties of the medium
•
Abrasionandmechanicalinuences
Youcannddetailedinformationontheprocessconditionsinchapter
"Technical data" as well as on the type label.
The instrument is suitable for standard and extended ambient condi-
tions acc. to IEC/EN 61010-1.
Switchosource
Protection against mois-
ture
Suitability for the process
conditions
Suitability for the ambient
conditions