22 63138-US-200110
Storage and Transport Temperature
3.6 Receiving the Equipment
Make sure you read and understand all the instructions and safety guidelines
in the Installation and Operation Guide before you unpack, install or
operate the equipment. The instructions in this guide are written for qualified
and trained personnel.
When you unpack your equipment, make sure you follow the steps below.
1. Unpack the unit in a clean, dry area.
2. Visually inspect the source holder for damage.
3. Check the entire shipment for damage during shipment.
4. File a claim against the carrier, reporting the damage in detail, if there was
damage to the unit during shipment. Any claims against VEGA for
shortages, errors in shipment, etc., must occur within 30 days of receipt of
the shipment.
Description Data
Ambient Temperature
- SHLD 2 with manual switching mechanism -50 … +105 °C (-58 … +221 °F)
- SHLD 2 with pneumatic switching mechanism -12 … +105 °C (+10 … +221 °F)
Relative Humidity 20 ... 85%
You must be familiar with radiation safety practices in accordance
with your U.S. Agreement State, the U.S. Nuclear Regulatory
Commission, or other local nuclear and international regulatory
agencies before unpacking the source holder.
If you must return the equipment to VEGA, make sure to contact
your VEGA representative.