Structure Location Preparation
Note: lt is critically important you start with square, solid and level base to
attach your Greenhouse.
The hardware to mount the structure permanently will need to be purchased separately at
your local hardware store.
Before preparing your surface for the structure please double check for possibility of any
underground utilities such as gas, telephone, cable or sprinkler lines.
Choose a level piece of land with good drainage and lots of sunlight. Ensure it is easy to
get around for essential cleaning and maintainance.
Remove any sod, grass, weeds, etc. from the area. Start with a packed and level dirt floor.
The recommended area for site preparation is 96.7" L x 74" W (2.456m L x 1.88m W)
for this structure.
Refer to your local building and city codes, ordinances, neighbourhood covenants, or
height restrictions regarding this type of structure for guidance on acceptable installation
requirements.
Following are some examples of how to prepare the location for the structure.
If you are using a soft, natural base, the following will be needed:
Sand
Landscape fabric
4 x 4 treated lumber for the base of the structure
Hardware for attaching lumber together
Hardware for mounting the structure to the lumber base
Gravel
Tie down kit
If you are using a concrete foundation, the following will be needed:
Hardware for mounting the structure to the concrete base
Use the following dimensions for the concrete foundation.
1.88M
(74”)
2.456M
(96.7”)
3.093M
(121.8”)