EasyManua.ls Logo

VENTOMAXX Z-WRG RONDO-Plus User Manual

Default Icon
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Decentralized
Assembly Instruction
Room Ventilation
Technical Changes Reserved 03.2016 © Ventomaxx International GmbH
Safety Indication
Z-WRG RONDO-Plus
according to DIN 1946- Part 6
measured according to DIN EN 20140-10 (former DIN 52210)
tested in accordance with the principles of the building supervisios conventions
for the sonic test beds; in agreement with NABau UA DIN 4109 Beiblatt 1 00.71.02.
measured according to EN ISO 717-1; test bed according to EN ISO 140-1
Operating Guidelines Vers. 1.25
Please read the following instructions carefully before the first operation of Z-WRG Plus.
You will gain important information in order to operate and service your new room
ventilator correctly. Ventomaxx excludes his liability, if the following references
are neglected.
LA
W
Straight Through the Wall
With a
central
Control Unit
to control from 1 up to 6 devices
General building supervision approval No. Z-51.3-247
Ventomaxx InternationalGmbH
Herzog Georg Platz 4
84028 Landshut
www.ventomaxx-international.com
Question and Answer IconNeed help?

Do you have a question about the VENTOMAXX Z-WRG RONDO-Plus and is the answer not in the manual?

VENTOMAXX Z-WRG RONDO-Plus Specifications

General IconGeneral
BrandVENTOMAXX
ModelZ-WRG RONDO-Plus
CategoryFan
LanguageEnglish

Summary

Assembly and Installation Instructions

General Prerequisites for Installation

Basic requirements for installing the ventilation devices and system setup.

Wall Opening and Electrical Connection Preparation

Steps for preparing wall openings and electrical connections for the WRG RONDO Plus.

Assembly Type LAW Installation

Instructions for the LAW mounting type, straight through the wall.

End Assembly on the Room Side

Steps for completing assembly and electrical connections on the room side.

Electronic Installation of Central Control Unit

Detailed steps for the electronic installation of the central control unit.

General Operating Instructions and Warranty

Important Safety Caution

Warning regarding electrical parts and mandatory expert maintenance.

Winter Operation Mode Details

Explanation of the 'winter operation mode' for frost protection and ventilation.

Cleaning and Care Guidelines

Procedure for cleaning the device housing and system carrier unit.

Filter Exchange Procedure

Recommendations and steps for regular filter exchange.

Central Control Unit ZS-Plus Operation

Initial Commissioning and Setup

Procedure for initial setup and commissioning of the ZS-Plus unit and connected devices.

Operating the ZS-Plus Unit

Explanation of using the ZS-Plus unit's buttons, LEDs, and modes.

Available Ventilation Programs

Description of four distinct ventilation programs (humidity, permanent, pulse, cross).

Configuration Mode

Setting Device Status (Active/Inactive)

Procedure to set ventilation devices as active or inactive using LEDs.

Managing Rolling Breaks

How to activate or deactivate rolling breaks for odd numbered devices.

Filter Exchange Display and Reset

Understanding the filter exchange indicator and how to reset it.