Vertiv | NetSure 7100 Series -48V DC Power System Installation Manual (IM582127000) | Rev. BB
Wiring to the Battery Tray
DANGER! Adhere to the “Important Safety Instructions” presented at the front of this document.
If the battery tray(s) was ordered with the system, wiring to the battery tray was performed at the factory. If a
battery tray is installed in the field, customer must wire to the battery tray.
Procedure
1. Refer to the wiring diagram provided in Figure 115, and wire the battery tray for your application. Refer
also to Figure 113 or Figure 114.