18
B. Insert the Conveyor Support into the Conveyor Belt, the
SmartPoint
®
Loading Location into the Conveyor Support, and the
Exit Gate into Conveyor Belt.
6. Assemble and attach the construction tower components following
the steps as below:
A. Insert the Switch Gate into Track F. Connect Track F to the 3-loop
spiral tower, connect the bridge part to Track F, insert the Spiral Track
Base into the Bridge Support, and insert the L-shape Plate Plates
into Track F.