61
GM 4700AC
OPERATING MANUAL
VERSION 06/2014 ORDER NUMBER DOC2311730
Activities Aid tools
4. Checking the switching sequence
- Attach the AC nozzle and air cap. Visual inspection
- Set the injection pressure to 100 bar; 10 MPa; 1450.40 psi, pull the
trigger guard slowly, note the switching sequence "switch on" and
"switch o ".
Switch on: atomizing air / shaping air on, product on
Switch o : product o , atomizing air / shaping air o
5. Flushing the gun
- Switch o the air and material supply, open ushing valve, pull
trigger lever and ush gun or blow out with air.
Flush the gun without the valve and air cap.
In doing so, you can remove the air connection hose.
- Close the ushing valve; when almost no material is escaping any
longer, remove the product connection hose and blow the rest of the
test medium out of the gun using an air gun.