EasyManua.ls Logo

WAGNER Super Finish 23i - System Connections and Setup; High-Pressure Hose and Gauge Connection

WAGNER Super Finish 23i
108 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
Super Finish 23i
GB
4.2 HIGH PRESSURE HOSE AND PRESSURE GAUGE
To check whether or not the hose is pressu-
rized, the provided pressure gauge has to be
secured to the high-pressure hose.
1. Screw the pressure gauge (11) to the hose connection (A)
or to the gun (B).
2. Screw the high pressure hose (9) onto the hose connec-
tion or the pressure gauge.
3. Screw the gun (10) or the material ball cock onto the high
pressure hose.
4. Tighten all union nuts on high pressure hose so that no
material can escape.
When unscrewing the high pressure hose,
hold rmly on the hose connection with a
22mm wrench.
4.3 HOPPER
1. Ensure that the sealing surfaces of the connections are
clean. Ensure that the red inlet (1) is inserted in the coat-
ing material inlet (4).
2. Screw the union nut (5) on the return pipe (6) onto the
connection (7).
3. Screw the upper hopper (8) onto the coating material in-
let (4).
11
A
B
11
1
4
5
6
7
8
9
10

Table of Contents

Related product manuals