23
EN
1 Anemometer 6 Aerial
2 Wind vane 7 U-bolt
3 Temperature and humidity meter 8 Battery compartment
4 Rain gauge 9 Reset
5 Spirit level 10
Led display: the light lights up for
4 seconds after switching on. The
led then ashes once every 48
seconds, indicating that data is
being transmitted (update period).
INSTALLATION
Installation of the U-bolts and the metal plate
The installation of the U-bolts, which x the sensor to a rod, rst requires the
installation of the supplied metal plate to which the ends of the U-bolts can
be attached. The metal plate (see Figure 3) has four holes through which the
ends of the U-bolts t. The metal plate itself is pushed into a groove on the
bottom of the unit. The metal plate has a straight edge that slides into the
groove and the other side is bent at a 90-degree angle for easier attachment
to the mounting rod. Once the metal plate is inserted, you can slide the U-bolts
through the holes in the metal plate (see Figure 3).
3