Do you have a question about the Warner Shelter Systems Limited MQ20H and is the answer not in the manual?
Brand | Warner Shelter Systems Limited |
---|---|
Model | MQ20H |
Category | Tent |
Language | English |
Assemble Corner 90°, Eve Tubes, and Mid Joints to form the eve frame structure.
Attach the first cross cable diagonally from corner to corner, hooking onto the corner pin.
Install the second cross cable, adjusting corners to shorten distance and tighten cables.
Unfold the drop sheet over cross cables to protect the tent top from damage and dirt.
Position tent top midway, unfold fabric, ensure center socket is aligned, and pull to corners.
Attach tent top webbings to frame corner loops by pulling the handle or using a stake.
Lift corners and slide posts over corner sleeves, securing with lock-pins and inserting s-hooks.
Push drop sheet down, insert centrepole through tent top socket, and install flag.
Place centrepole lower end on top cable, slide to intersection, wedge, and secure with lock-pin.
Install remaining posts, vertically position them, and drive stakes through post bases.
Tighten each tension strap to ensure proper tent top tension and tie off slack rope tails.
Attach guy ropes to corner loops as required for added stability in inclement weather.
Clip wall panels to the cable for slide wall installation.
Secure side wall straps to posts and top wall straps to the eve tube.
Fasten velcro strips on wall edges for a wind-proof seam when multiple walls are installed.
Unfold joiner, attach velcro straps to eve tube, and clip to cable: slide wall.
Insert lapels between posts, spread them under the valance, and secure straps to rings.
Straighten downspout, fasten joiner and wall velcro, and ensure joiner follows catenary curve.
Clean vinyl tops with mild detergent, rinse, and dry thoroughly; store clean and dry.
Tighten tops and walls, clean periodically, and repair any damage to fabric or frame parts.
Information on mildew, water resistance, flame resistance, fading, and cold crack properties.