EasyManua.ls Logo

Wedi Fundo Riolito neo User Manual

Default Icon
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
wedi Fundo Riolito
neo
Vertical Drain for 2" ABS pipe connection
Art.-No. 07-70-00/040
www.wedicorp.com
1
1
/16
5
7
/16
4
5
/8
Ø 2”

Other manuals for Wedi Fundo Riolito neo

Question and Answer IconNeed help?

Do you have a question about the Wedi Fundo Riolito neo and is the answer not in the manual?

Wedi Fundo Riolito neo Specifications

General IconGeneral
DimensionsVarious sizes available
ShapeRectangular
ColorWhite
WeightLightweight
WaterproofYes
Thermal InsulationYes
CategoryPlumbing Product
LengthDepends on model
WidthDepends on model
ApplicationShower areas
HeightDepends on model
Load CapacityHigh (suitable for wheelchair traffic when properly installed)

Summary

wedi Riolito neo Vertical Drain Installation

Mark Drain Center on Wall

Mark the center of the drain at the wall for accurate positioning during installation.

Mark Subfloor Cutout for Drain

Use the wedi template to mark the cut-out for the drain body recess in the subfloor.

Cut Drain Recess in Subfloor

Use a jigsaw to cut out the marked recess for the drain body in the subfloor.

Connect Drain Body to Pipe

Recess drain body, connect to ABS pipe with cement, and fasten pipe to subfloor.

Install Gasket on Drain Base

Install the wedi sealing gasket to the underside of the wedi base using the included screws.

Set Drain Base in Thinset

Install wedi base into thinset setting bed, ensuring gasket drops into the drain body.

Check Gasket and Drain Seating

Ensure no thinset obstructs the drain opening and the gasket is fully seated.

Related product manuals