EasyManua.ls Logo

Weishaupt thermo condens WTC 25-A User Manual

Weishaupt thermo condens WTC 25-A
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Condensing boilers Weishaupt Thermo Condens WTC 15-A / WTC 25-A and WTC 32-A 83247602 – 1/2008
Installation and operating instructions
manual

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Weishaupt thermo condens WTC 25-A and is the answer not in the manual?

Weishaupt thermo condens WTC 25-A Specifications

General IconGeneral
BrandWeishaupt
Modelthermo condens WTC 25-A
CategoryBoiler
LanguageEnglish

Summary

General Instructions

Explanation of Notes and Symbols

Details symbols used for safety warnings and procedures in the manual.

Safety Instructions

General Safety Warnings

Covers essential safety precautions for installation and operation of the unit.

Specific Safety Measures

Details safety precautions for electrical work, maintenance, and construction alterations.

Safety Measures When Gas Can Be Smelled

Specific safety protocols to follow when gas is smelled or during gas operation.

Technical Description

Permissible Application

Defines the intended use and installation constraints for the Weishaupt Thermo Condens unit.

Installation

Installation Safety Precautions

Critical safety guidelines to follow before and during the installation process.

Wall Mounting Procedure

Step-by-step guide for securely mounting the boiler unit to the wall.

Water Connections and Filling

Details on connecting mains water, filling the system, and checking expansion vessel.

Electrical Connection

Procedures for safely connecting the unit's electrical supply.

Gas Side Connection

Guidelines for connecting the gas supply, including safety valve requirements.

Flue Gas Connection

Requirements and procedures for connecting the flue gas system.

Commissioning and Operation

Operating Controls Overview

Explains the function of the dial knob, enter, and reset buttons on the control panel.

Initial Commissioning Safety

Crucial safety checks and procedures for the first start-up of the unit.

Commissioning Checklist

Procedural list for verifying all steps are completed before final commissioning.

Commissioning Process

Detailed steps for the initial heating up and setup of the system.

Operating Instructions

Heating Engineer Level - Entry and Navigation

Procedure to access and navigate the heating engineer level menu.

Heating Engineer Level - Error Memory

How to call up and view the last 6 error messages and system conditions.

Safety and Monitoring Function

Temperature Monitoring

Systems for monitoring boiler circuit and flue gas temperatures for safety.

Cause and Rectification of Faults

Fault and Warning Messages

Identifies error codes, their causes, and recommended rectification steps.

Service

Servicing Safety and Intervals

Guidelines for qualified personnel, safety notes, and recommended service frequency.

Servicing Checklist

Comprehensive list of tasks to perform during regular maintenance.

Related product manuals