Do you have a question about the Weishaupt thermo condens WTC 25-A and is the answer not in the manual?
Details symbols used for safety warnings and procedures in the manual.
Covers essential safety precautions for installation and operation of the unit.
Details safety precautions for electrical work, maintenance, and construction alterations.
Specific safety protocols to follow when gas is smelled or during gas operation.
Defines the intended use and installation constraints for the Weishaupt Thermo Condens unit.
Critical safety guidelines to follow before and during the installation process.
Step-by-step guide for securely mounting the boiler unit to the wall.
Details on connecting mains water, filling the system, and checking expansion vessel.
Procedures for safely connecting the unit's electrical supply.
Guidelines for connecting the gas supply, including safety valve requirements.
Requirements and procedures for connecting the flue gas system.
Explains the function of the dial knob, enter, and reset buttons on the control panel.
Crucial safety checks and procedures for the first start-up of the unit.
Procedural list for verifying all steps are completed before final commissioning.
Detailed steps for the initial heating up and setup of the system.
Procedure to access and navigate the heating engineer level menu.
How to call up and view the last 6 error messages and system conditions.
Systems for monitoring boiler circuit and flue gas temperatures for safety.
Identifies error codes, their causes, and recommended rectification steps.
Guidelines for qualified personnel, safety notes, and recommended service frequency.
Comprehensive list of tasks to perform during regular maintenance.