EasyManua.ls Logo

Westinghouse Porcel-line 150 DHP 750C User Manual

Westinghouse Porcel-line 150 DHP 750C
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
l
.
B
.
32
-
253
-
4
B
Instructions
for
Porcel
-
line
®
Type
DHP
Magnetic
Air
Circuit
Breakers
Westinghouse
Electric
Corporation
Distribution
and
Control
Business
Unit
Commercial
Operations
Division
-
ILS
Department
Pittsburgh
,
PA
15220
I
.
B
.
32
-
253
-
4
B
Effective
January
,
1989
Supersedes
I
.
B
.
32
-
253
-
4
A
dated
September
,
1978
Courtesy of NationalSwitchgear.com
Question and Answer IconNeed help?

Do you have a question about the Westinghouse Porcel-line 150 DHP 750C and is the answer not in the manual?

Westinghouse Porcel-line 150 DHP 750C Specifications

General IconGeneral
BrandWestinghouse
ModelPorcel-line 150 DHP 750C
CategoryCircuit breakers
LanguageEnglish

Summary

SAFETY

PURPOSE

INTRODUCTION

GENERAL DESCRIPTION

Arc Chutes

Contains arc runners, ceramic interrupter stacks, arc shields, blowout coils, baffles, deflectors.

Barrier Assembly

Grounded steel front panel and insulating side sheets to shield pole units and arc chutes.

Accessories

Includes handling dolly, maintenance lever, levering-in crank, and arc chute lifter.

SAFETY FEATURES

SAFE PRACTICES

Mechanism Panel

Located on breaker chassis, houses control items like trip magnets and auxiliary switches.

RECEIVING, HANDLING AND STORING

RECEIVING

Inspect crates for damage, check contents against packing list, and examine breaker for shipping damage.

HANDLING

Guidelines for handling breaker shipping containers and individual components.

STORING

DESCRIPTION AND OPERATION

MANUAL SPRING CHARGING

Instructions on how to manually charge the closing spring using a ratcheting lever.

MANUAL CLOSING

MANUAL TRIPPING

MAINTENANCE CLOSING

ELECTRICAL CLOSING AND TRIPPING

STORED ENERGY MECHANISM

CONTACTS

ARC CHUTES

INTERPHASE BARRIERS

LEVERING-IN DEVICE

PUFFER

SHUTTER ROLLER

GUIDE CHANNEL AND RAIL LATCH

SECONDARY CONTACTS

GROUND CONTACT

BREAKER POSITION INDICATOR AND MOC SWITCH OPERATING PIN

INTERLOCKS

Breaker-Cell Coding Plates

Ensures only correctly rated breakers fit the cell using notched plates and bars.

Levering-in Interlock

Prevents moving the breaker if contacts are closed, with a fail-safe pin mechanism.

Anti-Close Interlock

Floor Tripping and Closing Spring Release Interlocks

CONTROL SCHEMES

UNDERVOLTAGE TRIP ATTACHMENT

ACCESSORIES

CONTACT ADJUSTMENTS

INSTALLATION

Position Breaker

Moving breaker to a convenient location near the metal-clad cell.

Mount Arc Chutes on Breaker

General procedure for mounting arc chutes on the breaker.

Connect Shunt Strap

Connecting the shunt strap from lower contact to front arc chute connection.

Mount Barrier

Attaching barrier assembly to the breaker chassis using provided hardware.

Position Breaker in Front of Cell

Operate the Breaker in Test Position

Lever Breaker into Cell

ADJUSTMENTS

HOLDING PAWL ADJUSTMENT

Repositioning the holding pawl if the closing spring does not charge.

ANTI-CLOSE INTERLOCK ADJUSTMENT

Adjusting clearance for the closed breaker interlock to prevent accidental closing.

LATCH CHECK SWITCH ADJUSTMENT

CONTACT GAP ADJUSTMENTS

CONTACT PENETRATION ADJUSTMENT

CONTACT PENETRATION – MAJOR ADJUSTMENT

Procedure for setting contact penetration when operating rods are disconnected.

CONTACT PENETRATION – MINOR ADJUSTMENT

FLOOR TRIPPER ADJUSTMENT

MAINTENANCE

INSPECTION SCHEDULES

Factors determining inspection frequency: time, load operations, and short circuit operations.

INSPECTION/MAINTENANCE PROGRAMS

Establishing a program for routine examination and maintenance.

INSPECTION/MAINTENANCE RECORDS

Importance of recordkeeping for documenting inspections, conditions, and maintenance procedures.

ROUTINE INSPECTION INTERVAL BASED ON TIME

ROUTINE INSPECTION INTERVAL BASED ON LOAD SWITCHING

INSPECTION INTERVAL BASED ON SHORT CIRCUIT SWITCHING

SERVICE CONDITIONS

ROUTINE INSPECTION

MECHANICAL OPERATION

LOW LEVEL LOAD CURRENT SWITCHING DUTY

MODERATE TO HIGH LEVEL SWITCHING DUTY

CAPACITOR SWITCHING

TOTAL BREAKER LIFE

CHANGING DUTY CONSIDERATIONS

INSPECTION/MAINTENANCE PROGRAM REVIEWS

MAINTENANCE PROCEDURES

CONTACTS

ARC CHUTE

MECHANICAL TIMING

MINIMUM CLOSING SPEED

MINIMUM CONTACT SEPARATION

MECHANISM

LUBRICATION

INSULATION

SPRING CHARGING MOTOR

REMOVAL OF CLOSING SPRING

MOUNTING ARC CHUTE

CONNECT SHUNT STRAP

BARRIER

MOUNTING ARC CHUTE

CONNECT SHUNT STRAP

BARRIER

MOUNTING ARC CHUTE

CONNECT SHUNT STRAP

BARRIER

MOUNTING ARC CHUTE

CONNECT SHUNT STRAP

BARRIER

MOUNTING ARC CHUTE

CONNECT SHUNT STRAP

BARRIER

PARTS IDENTIFICATION

RECOMMENDED STOCK OF RENEWAL PARTS

RENEWAL PARTS ORDERS

Related product manuals