Maintenance
3303−5/A1
RT-flex58T-D
Winterthur Gas & Diesel Ltd.
1/ 3
Tools: Key to Illustrations:
1 Manual ratchet (WLL 800 kg) 94016 (H3) 1 Piston rod
1 Manual ratchet (WLL 2500 kg) 94016E (H1) 2 Cylinder block
2 Manual ratchets (WLL 250 kg) 94016G (H2) 3 Elastic stud
2 Eye bolts 94045-M12 (RC) 4 Toggle lever
2 Round slings (WLL 1000 kg) 94049 5 Bearing cover
1 Round sling (WLL 1000 kg) 94049A 6 Crosshead pin
1 Deviation pipe GF 94117A
1 Working platform 94142
2 Lifting tools GF 94333A
2 Chains with hook and shackle GF 94333B
1 Wire rope sling GF 94333D
2 Shackles 94572I
1. Removal
Remark: Pay attention to General Guidelines for Lifting Tools 0012−1.
⇒ Suspend piston rod 1 and turn crank of the cylinder concerned to B.D.C. as
described for Changing the Compression Shims 3403−2 (see also view I).
⇒ Remove toggle lever 4.
⇒ Remove platform element.
⇒ Mount deviation pipe GF 94117A to the column door.
A B
4
GF 94117A
I
I
94142
1
2
3
WCH00811
Connecting Rod
Removal of Bearing Cover to Top End Bearing
V2 / 2013