EasyManua.ls Logo

WinGD WARTSILA RT-flex58T-D - Page 376

Default Icon
498 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance66062/A1
RT-flex58T-D
Winterthur Gas & Diesel Ltd.
6/ 6
F
ZS
3
TR12
b a94662(A) 11 94663A(B)
010.576/02
EXPANSION
SIDE
3.1 Final assembly
Screw in as much as possible of screws 5.
Push / pull tube stack 12 towards the air side by means of screws 13, 13a.
Remove pulley plate 94662(A).
Screw in remaining screws 5. Subsequently tighten all screws.
Remove assembling device & pulley support.
Connect piping, close drains 7, open vents 6
and butterfly valves 10.
Start cooling water pump and check tube
stack for possible leaks.
Fit cover 1 and seal it with non-hardening
sealing compound.
Remark: The connection of cooling water outlet 9
is arranged in such a way that it is always near to
the scavenge air inlet into the receiver.
12
I
010.847/03
14
G
94662(A)
5
018.985/09
I
2013
Scavenge Air Cooler: Removal and Fitting of Tube Stack

Table of Contents

Related product manuals