Sawmill Assembly
3
3-1 15doc092319 Sawmill Assembly
SECTION 3 SAWMILL ASSEMBLY
IMPORTANT! The sawmill is shipped properly secured to the pallet. Before
starting sawmill assembly, remove the shipping brackets securing the sawmill
to the pallet. Also, remove the shipping bracket and the shipping bolt securing
the saw head to the mast.
See Figure 3-1.
See SECTION 8
for complete alignment instructions.
3.1 Leg Assembly
NOTE: If assembling the sawmill to an LT15TRG trailer (LT15GO), skip this
step. Refer to the trailer option manual for assembly instructions then return to
the next section when instructed to complete sawmill assembly.
FIG. 3-1
Remove shipping brackets
Remove shipping bolt