SETUP & OPERATION
Sawmill Setup
SETUP & OPERATION 25doc052711 2-1
2
SECTION 2 SETUP & OPERATION
2.1 Sawmill Setup
IMPORTANT! Before starting to use the sawmill you have to meet the
following conditions:
Set up the sawmill on firm, level ground and level the sawmill. Secure the sawmill to the
ground to prevent moving during operation. A concrete foundation or pads (rated to support
31 T/m
2
at each sawmill foot position) and 16mm anchored bolts are recommended.
Under roof, the sawmill should always be operated with the sawdust collection system.
The sawmill can be operated under roof only.
The sawmill can be operated in temperature range from -15
o
C to 40
o
C only.
The illumination at the operator's position should be at least 300lx.
The sawmill operator’s position is shown below.
2.2 Stationary Sawmill Setup
Set up the mill on firm footing and level by eye. Fasten the mill to the floor to prevent any creep after
prolonged use. A cement pad with 5/8” (16 mm) diameter anchor bolts is recommended. The cement
pad should be rated to support 6350 lbs./sq.ft. (31 T/m) at each sawmill foot position.
NOTE: Make sure the unit is level before securing.The sawmill mast should not be tilted from the
vertical more than 3
o
towards the log loader. The mast should not be tilted in the opposite direction.
!