EasyManua.ls Logo

Wood-mizer LT40 DH Series - SECTION 2 SETUP & OPERATION; Stationary Sawmill Setup

Wood-mizer LT40 DH Series
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup & Operation
Stationary Sawmill Setup
2
2-1 HDSdoc091108 Setup & Operation
SECTION 2 SETUP & OPERATION
2.1 Stationary Sawmill Setup
See Figure 2-1. Set up the mill on firm footing and level by eye. Fasten the mill to the floor to pre-
vent any creep after prolonged use. A cement pad with 5/8” diameter anchor bolts is recom-
mended. The cement pad should be rated to support 6350 lbs./sq.ft. at each sawmill foot position.
NOTE: Make sure the unit is level before securing. It IS possible to twist the mill frame by jacking
one foot higher than the others.
WARNING! Securely fasten the feet of a stationary sawmill to
the floor before operating the sawmill. Failure to do so may result
in serious injury or death.
FIG. 2-1
HD0131ce_d
1790
820
2590
850
2820
2620
810
1935
820
3830
2040
825
2790
775
LT40 S Stationary Metric Dimensions*
LT40 M Stationary Metric Dimensions*
*All
d
im
e
n
s
i
o
n
s
in millim
e
tr
es

Table of Contents

Related product manuals