EasyManua.ls Logo

Wood-mizer LT40 Series - Middle Track Cover

Wood-mizer LT40 Series
146 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup & Operation
Middle Track Cover
2
2-11 HDdoc012020 Setup & Operation
2.4 Middle Track Cover
Before operating the sawmill do as follows:
1. Clean the upper and lower rails to remove any sawdust and rust preventives.
2. Unbolt and remove the middle track cover from its storage position.
3. Soak the felt wiper with Dexron III transmission fluid, 10W30 motor oil or 3-in-1 turbine oil.
4. Install the middle track cover so it fits against the rail and secure with two thumb screws.
See Figure 2-10.
CAUTION!
Install the track cover so that it lightly touches the track rail. If the
wiper presses too firmly against the rail, it can cause the power feed to bind.
FIG. 2-10
Install the track
cover and secure
with two screws
3HPL01
Install the track
cover and secure
with two screws

Table of Contents

Other manuals for Wood-mizer LT40 Series

Related product manuals