EasyManua.ls Logo

Wood-mizer LT40L DH - Preparing Sawmill for Towing; Towing Preparation Steps and Outrigger Caution; Clamp Position for Towing

Wood-mizer LT40L DH
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup & Operation
Preparing The Sawmill For Towing
2
2-31 doc041118 Setup & Operation
the feed rate knob down to ‘0’ and place the feed switch in the forward position. Blow any remaining
water from the water lube hose and valve. Return the forward/reverse switch to neutral and turn the
key switch to off (#0).
2.20 Preparing The Sawmill For Towing
The Wood-Mizer trailer package makes transporting your sawmill easy and convenient. To get your
sawmill ready for towing, follow these instructions.
1. Move the saw carriage to the front end of the sawmill. Raise the rear outriggers.
See Figure 2-16. Secure outrigger with both Locking Pin and Travel Lock Pin.
CAUTION! Be sure the outrigger base is adjusted properly before
securing in travel position with the lock pin.
CAUTION! Do not adjust the outrigger base height while there is
weight on it. Damage to the outrigger may result.
2. Move the clamp all the way in toward the main bed frame tube.
FIG. 2-16. ADJUSTABLE OUTRIGGER.
Locking Pin
Outrigger Leg
Travel Lock Pin
80_008
Adjustment
Bolt

Table of Contents

Related product manuals