EasyManua.ls Logo

Wood-mizer LT40L DH - Sawmill Towing Preparations (Continued); Loose Object Removal and Fender Placement; Outrigger Raising for Travel; Trailer Operators Manual Reference

Wood-mizer LT40L DH
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup & Operation
Preparing The Sawmill For Towing
Setup & Operation doc041118 2-34
2
12. Remove all loose objects from the bed of the mill. Store the outrigger jack handle in the bracket
provided on the rear/loading-side outrigger guide. Reel in the winch cable. Remove the winch
handle.
13. Place both fenders in the slots located behind the trailer tires and secure with retaining pins. Raise all
but the very front outrigger.
See the trailer operator’s manual for specific information regarding hitch operation and towing the
sawmill.

Table of Contents

Related product manuals