Setup
Install the operator’s handle
3
3-12 WM doc 12/21/22Setup
2. Attach the stop blocks (X100-1275) on the outside surface of the bed section at the head of the bed using M10-1.5x30
bolts. Tighten the nuts. See FIG. 3-15.
3. Repeat at the foot end of the rail.
3.6 Install the operator’s handle
1. Remove the operator’s handle from its ship-
ping position by loosening the bolts enough
to remove the handle and clipping the tie
wrap holding on the throttle cable.
2. Invert the handle and replace it as shown.
See FIG. 3-16.
3. Tighten all the handle bolts.
NOTE: Inserting the handle until it touches the
sawhead will interfere with the crank handle
motion. Only insert the handle just past the
L-bolts.
3.7 Install the Engine
1. Place the latch hook into the top center of the saw head
with the fasteners provided. See FIG. 3-17.
2. Unpack the engine and its parts.
3. Set the engine on the engine mounting platform and
loosely secure with M10x50mm bolts. See Fig. 3-18.
NOTE: If the engine (G7-LX) is
equipped with additional
mounting plate, first install the
plate.
Stop Block
Bolt, M10-1.5x30
Nut, M10-1.5
FIG. 3-15
Bolt, M8 L Handle
Handle
Nut, M8-1.25 Hex
Nylock
Washer, M8 Flat
FIG. 3-16
Bolt, M8-1.25x16
Latch Hook
Washer, 8mm Split
Lock, ZN
FIG. 3-17