EasyManua.ls Logo

Wood-mizer LX55 - Assemble the Log Bed

Wood-mizer LX55
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly
Assemble the Log Bed
3
3-4 LX55 9/17/20 Assembly
7. Slide the mast uprights into the mast carriage rollers and loosely secure with M10x80mm bolts
as shown in Fig. 3-3.
Use assistance in lowering the sawhead. Avoid injury and
equipment damage.
8. Set the sawhead in a stable vertical position.
NOTE: Do not assemble more on the carriage until later steps are com-
pleted.
3.5 Assemble the Log Bed
The bed should be assembled on its operation site.
NOTE: Do not assembly the catch rail to the bed until after the carriage
has been placed on it.
FIG. 3-3
Bolt, M10x80mm,
Carriage
Nut, M10 Flanged
Nylon Lock
WARNING!

Table of Contents

Related product manuals